In the course of the work, the history of the deposits, stock literature were considered, and materials from the work carried out in the region of our object under study were also studied. In the calculation part of the work the following were calculated: a technological diagram of a cyclone dust collector, a technological calculation of an absorption column for drying produced natural gas, a technological calculation of equipment for purifying produced natural gas from hydrogen sulfide (H2S) and carbon dioxide (CO2), as well as a technological diagram for odorization of transported gas.
Keywords: field, deposit, complex gas treatment plant, dust collector, absorption gas drying, absorber, diethylene glycol